Slaughter Kitchen Remodel
Before
|
Slaughter Kitchen Remodel
Before
|  |
 |
Slaughter Kitchen Remodel
Before
|
Slaughter Kitchen Remodel
At tear out, They want to open up the kitchen area to the living room and dining room.
|  |
 |
Slaughter Kitchen Remodel
At tear out
|
Slaughter Kitchen Remodel
A larger tray ceiling was framed up
|  |
 |
Slaughter Kitchen Remodel
Walls were taken out and beams installed to open the wall to the living room.
|
Slaughter Kitchen Remodel
At the sheetrock stage. The part of the project home owners hate the most.
|  |
 |
Slaughter Kitchen Remodel
We try to contain the dust, but it still gets through.
|
Slaughter Kitchen Remodel
The owners are excited and can't wait to cook in their new kitchen
|  |
 |
Slaughter Kitchen Remodel
The kitchen will have a built in desk area.
|
Slaughter Kitchen Remodel
The kitchen will be alot more open and the flow into the living room and dining room will be much easier
|  |
 |
Slaughter Kitchen Remodel
The owners loved the idea of the kitchen opening up into the living room so when they are entertaining you are not confined to a smaller area.
|
Slaughter Kitchen Remodel
A raised bar will be installed between the kitchen and dining room.
|  |
 |
Slaughter Kitchen Remodel
It is all coming togather
|
Slaughter Kitchen Remodel
The wine cabinets add a nice touch
|  |
 |
Slaughter Kitchen Remodel
Waiting on a few light fixtures that were back ordered
|
 |
Moore deck
The Moores had a nice,large deck on the back of their home, unfortunetly it was old and starting to rot.
|
Moore Deck
The deck was becoming unstable and unsafe
|  |
 |
Moore Deck
The patio below the deck was not sloped properly for run off and was causing water problems
|
Moore Deck
We completly removed the dack and patio
|  |
 |
Moore Deck
We found that a patio was poured on top of an older patio and the concrete was about 14" thick
|
Moore Deck
We poured a new colored patio and stamped a finish
|  |
 |
Moore deck
We added concrete columns to support the deck and roof, they will later be covered with stone
|
Moore Deck
A patio drain was installed to help with water issues
|  |
 |
Moore Deck
The deck was constructed out of cedar and the railing will be powder coated aluminum
|
Moore Deck
The new stamped patio is in and waiting to be cleaned and sealed
|  |
 |
Moore Deck
The deck is being stained and then it will be ready for the aluminum railing and deck lights
|
Moore Deck
The Patio is nearing completion. All the rain this summer has slowed the progress a little.
|  |
 |
Moore Deck
The railing is up and the deck stain is completed.
|
Moore Deck
The view from their deck is very nice.
|  |
 |
Moore Deck
Concrete retaining walls being formed up
|
Moore Deck
New steps will be formed between the retaining walls
|  |
|
|
|
|
|
|